Product Details:
Payment & Shipping Terms:
|
Item: | Hot Oil Boiler, Thermal Oil Heater | Structure: | Hot Oil Tube |
---|---|---|---|
Pressure: | Low Pressure | Style: | Horizontal |
Fuel: | Oil,Gas,Diesel,LPG,HFO,Lng | Thermal Power: | 120kw, 240kw, 350kw, 500kw,700kw |
Thermal Effiency: | >75% | Medium Outlet Temperature: | <350C |
Heating Area: | 9.8-520M2 | Warranty: | 2 Years |
High Light: | thermic oil boiler,oil steam boiler |
Exported 120KW-6000KW coal/wood fired Thermal Oil Heating Boiler
This series boiler is a new type of special boiler with low pressure, high temperature The heating temperature can reach liquid 340℃ or steam 400℃.If your craft need to be heated stable and do not allow to use flame directly, it can reach 150℃-380℃ and used in a variety of production situations.
Characteristics of Industrial YGL Biomass Coal Fired Thermal Oil Heater
Owing to its characteristics of high heating temperature, low working pressure, energy saving, YGL series thermal oil boiler can be widely used in a variety of industrial heating process. Such as petroleum chemical industry, synthetic fiber industry, textile printing and dyeing, plastic and rubber, paper industry, wood industry, building material, machinery industry, food industry, electrical equipment, coking industry, metal and casting industry, detergent industry, fat and paint industry, carbon industry.
Model | YGL |
Rated Thermal Power | 120-6000 KW |
Design Pressure | 1.1 Mpa |
Working Pressure | 0.8 Mpa |
Medium Outlet Temperature | ≤350 C |
Fuel | coal/ wood/ biomass fuel /oil/ gas |
Application | The chemical industry / Plastics Industry/ The textile industry/ The rubber industry/ The food industry/ Forest Products Industry/ The paper industry |
Technical parameters
Model | YGL-120MA | YGL-240MA | YGL-350MA | YGL-500MA | YGL-700MA | YGL-1000MA | YGL-1200MA | YGL-1400MA |
Item | ||||||||
Rated power(KW) | 120 | 240 | 350 | 500 | 700 | 1000 | 1200 | 1500 |
Design | 1.1 | |||||||
pressure(Mpa) | ||||||||
Rated working | 0.8 | |||||||
pressure(Mpa) | ||||||||
Highest working | <350 | <350 | <350 | <350 | <350 | <350 | <350 | <350 |
temperature(C) | ||||||||
Furnace oil | 0.1 | 0.15 | 0.3 | 0.38 | 0.52 | 0.7 | 0.85 | 1.02 |
volume(m3/h) | ||||||||
Circulation oil | 10 | 20 | 30 | 40 | 60 | 80 | 100 | 100 |
volume(m3/h) | ||||||||
Pipe connection diameter(DN) | 40 | 65 | 80 | 80 | 100 | 125 | 125 | 125 |
Thermal Efficiency(%) | 75 | |||||||
Size (m) | 1.2x1.1x2.5 | 1.7x1.5x3.0 | 1.8x1.6x3.3 | 2.0x1.9x3.6 | 2.2x2.1x3.8 | 2.9x2.5x4.7 | 2.9x2.5x5.1 | 3.0x2.9x5.4 |
Weight (t) | 2.2 | 2.7 | 3.4 | 3.9 | 4.8 | 7.4 | 8 | 10.2 |
Main features of industrial thermal oil boiler
1. It is convenient to be adjusted, and can supply balanced heat to satisfy the hard work required to precise temperature.
2. Less heat loss, high thermal efficiency.
3. Excellent structure, advanced techniques.
4. Simple operation, serious control.
FAQ
A:After confirming all the details about your requirement, we will provide you with several sets of related project pictures we have done before. Once you are satisfied with our strength and our products, lets continue.
A: 2.1. What type boiler you need, steam boiler, thermal oil boiler or hot water boiler?
2.2. What is the fuel type for you boiler, biomass(coal, shell, pellet etc.), gas or oil?
2.3. What is the requirement for oil/steam temperature and pressure?
2.4. What is the evaporation capacity of boiler required?
A: For single boiler, usually you can get the detailed offer within 1 day after details confirmed; For whole set project; the time takes longer and usually 2-3 days for tentative plan and process flow drawing.
A: We have been in the boiler equipment fields for many years and obtain a good reputation with the up/down partner. So we have much richer resource in different fields like the burn system PIC control instrument, raw material qualiy selecting shipping installation etc. We are comprehensive company with experiences for different fields.
A: For boiler body, we provide you with 2 year quality warranty.for all the parts of our equipment by repairing or replacing, damage caused by human excepted. For whole project, our engineer will stay in your site for equipment installation, debugging and training till you get standard products from the equipment. If necessary, we will also help you find an engineer to work for you for 1 or 2 year for your plant management.
Contact Person: Amy